WIKA was born out of the nationalization process of a Dutch company bearing the name Naamloze Vennotschap Technische Handel Maatschappij en Bouwbedijf Vis en Co. or NV Vis en Co. Pursuant To Government Regulation No. 2 / 1960 and Minister of Public Works and Electric Power (PUTL) Decree No. 5 dated 11 March 1960, WIKA was established with the name of Perusahaan Negara Bangunan Widjaja Karja. WIKA’s line of business at the time was electrical and water pipe installation works. In the early 1960s, WIKA took part in the construction project of Gelanggang Olah Raga Bung Karno on the occasion of the Games of the New Emerging Forces (GANEFO) and the 4th Asian Games in Jakarta.
With the passing of time, various improvements were made in order to continue growing as well as contribute to nation-building by providing construction services throughout the country.
The first significant growth occurred in 1972, when the name Perusahaan Negara Widjaja Karja was changed to PT Wijaya Karya. WIKA then developed into a construction contractor by handling various important projects such as the installation of electricity grids at Asahan and the Jatiluhur irrigation project.
Lead Electrical Engineer
* Male
* S1 Electrical (reputable university)
* Having 3-5 years work experiences in Power Plant Project
* Experience in Power Plant is preference
* Familiar with Panel, Cable, Tray, Trafo, Ups, etc, Bulk Material
* Familiar with related Code & Standard (IEC, ANSI, IEEE, NEC), Equipment Sizing (MCC, SWGR, TRANSFORMER, EDG, UPS, DC System), System Study, Data Sheet
* Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
* Familiar with electrical engineering software such as ETAP
Lead Process Engineer
* Male
* S1 Chemical Engineering (reputable university)
* Min 3-5 years work experiences
* Experience in Power Plant Project is preference
* Familiar with related Code & Std, Process Description, PFD, PID, Material & Heat Balace, Thermodinamic, Process Control Philosophy, Operating Phylosophi. Preferable understood Precomm & Comm
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant.
Lead Instrument Engineer
* Male
* S1 Electrical / Instrument / Engineering Physics (reputable university)
* Min 3-5 years work experiences
* Experience in Power Plant Project is preference
* Familiar with related Code and std (ISA, API, ASTM, ASME) PLC, DCS, SCADA, Field Instrument, Loop Diagram, Hook Up
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
Senior Electrical Engineer
* Male
* S1 Electrical (reputable university)
* Min 6 years work experiences
* Experience in Power Plant is preference
* Familiar with electrical engineering code & standard for Power Plant application
* Has experience in design, installation, pre-com/commissioning and start-up electrical equipment for power plant.
* Familiar with electrical engineering software such as ETAP
Senior Instrument & Control Engineer
* Male
* S1 Engineering Physics (reputable university)
* Min 6 years work experiences
* Experience in Power Plant Project is preference
* Familiar with Instrument & Control engineering code & standard for Power Plant application
* Has experience in design, installation, pre-commissioning, commissioning and start-up instrumentation & control for power plant
Lead Mechanical Engineer
* Male
* S1 Mechanical (reputable university)
* Minimum 5 years experience as Mechanical Engineer of Designing, Maintenance or Construction in power plant project
* Advance knowledge in pump and pumping and skill in Hydraulic calculation & thermodynamic
* Applied knowledge of mechanic of material and machine elements & Project Management
* Basic knowledge of safety environment (LOTO, permit system, lifting, rigging, scaffolding, fire protection, hydrocarbon management, etc)
* Basic knowledge of material & welding inspection
* Understand well with API, ANSI, ASTM, ASME
* Understand well with other design and construction of process facilities modification, upgrade, or new design
* Understand well with pipe stress analysis, Caesar & Fluid flow and modeling software
QA / QC Inspector
* Male
* S1 Electrical / Mechanical (reputable university)
* Min 4 years work experiences
* Experience in Power Plant Project is preference
* Has experience in installation, inspection & test, pre-commissioning, and commissioning for power plant.
* Familiar with code and standard for site inspection and test electrical equipments for power plant application.
* Familiar with site inspection & test, pre-com/commissioning report procedure
OTHERS :
* Ready for remote area
* Working under pressure
* Fluently in English
* Microsoft Office / Open Office (Microsoft word, Microsoft excel, Microsoft Project, Microsoft Power Point)
Please send your CV and application to: job-wika@wika.co.id mentioning the position applied in the subject of the email before 26 Agustus 2011
Minggu, 07 Agustus 2011
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar